{"id":70296,"date":"2020-10-09T11:13:29","date_gmt":"2020-10-09T09:13:29","guid":{"rendered":"https:\/\/sunbeam-communications.com\/?p=70296"},"modified":"2021-03-19T12:37:20","modified_gmt":"2021-03-19T11:37:20","slug":"europes-largest-charging-park-for-electric-cars-opens","status":"publish","type":"post","link":"https:\/\/sunbeam-communications.com\/en\/europes-largest-charging-park-for-electric-cars-opens\/","title":{"rendered":"Europe\u2019s largest charging park for electric cars opens"},"content":{"rendered":"<div class=\"QmZWSe\">\n<div class=\"DHcWmd\">\n<div id=\"tw-target\">\n<div id=\"kAz1tf\" class=\"g9WsWb\">\n<div id=\"tw-target-text-container\" class=\"tw-ta-container tw-nfl\" tabindex=\"0\">\n<p id=\"tw-target-text\" class=\"tw-data-text tw-text-large tw-ta\" dir=\"ltr\" data-placeholder=\"\u00dcbersetzung\"><span lang=\"en\">Press Release<\/span><\/p>\n<h1 class=\"tw-data-text tw-text-large tw-ta\" dir=\"ltr\" data-placeholder=\"\u00dcbersetzung\">Europe\u2019s largest charging park for electric cars opens<\/h1>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<h2>Tesvolt supplies 2 MWh storage system for 100-percent green power<\/h2>\n<p>Wittenberg\/Germany, 8 October 2020 \u2013 <strong>Europe\u2019s largest charging park for electric vehicles will open on Friday at the Kreuz Hilden junction. The first construction phase of the \u201cSeed &amp; Greet\u201d charging park is complete and 44 charging stations from various operators are ready, including Europe\u2019s fastest charging stations from Tesla and Fastned. All the charging stations are supplied with 100-percent green power from sources including a large photovoltaic installation on the charging park\u2019s carports and the high-performance storage devices from the German manufacturer Tesvolt. <\/strong><\/p>\n<p>You can find<strong> press images <\/strong>here: <a href=\"https:\/\/www.tesvolt.com\/en\/press\/europes-largest-e-car-charging-station-opens.html\" target=\"_blank\" rel=\"noopener noreferrer\">https:\/\/www.tesvolt.com\/en\/press\/europes-largest-e-car-charging-station-opens.html<\/a><\/p>\n<p>Europe\u2019s largest charging park project, covering 12,000 square metres, is located at the Kreuz Hilden junction between the A3 and A46 motorways in Germany. The first construction phase involved completing half of the planned 114 charging stations. The current 28 fast charging stations from Fastned and Tesla \u2013 including 12 superchargers of the latest V3 generation \u2013 can be used to charge electric vehicles with charging power of up to 250 kilowatts (kW). The operator of the charging park will also be providing a further four public charging stations with charging power of up to 22 kW and twelve stations for staff and tenants. While waiting for their cars to charge, motorists will now also be able to use the caf\u00e9-bistro with organic bakery that covers 150 square metres.<\/p>\n<h3>Potential hurdles due to Renewable Energy Sources Act (EEG) amendment<\/h3>\n<p><em>\u201cI hope the EEG amendment doesn\u2019t disrupt projects like these in the future. Lots of people have approached me about their interest in setting up similar projects. If the EEG amendment places further restrictions on self-consumption, however, any such projects would be stifled<\/em>,\u201d says Roland Sch\u00fcren, master organic baker and operator of the charging park. <em>\u201cNot only do Germany and Europe need more e-mobility, they particularly need more e-mobility with electricity from renewable energies.\u201d<\/em><\/p>\n<h3>Europe\u2019s most innovative charging park<\/h3>\n<p><em>\u201cSeed &amp; Greet is currently not only the largest, but is also the most innovative charging park. A sophisticated energy concept with heat recovery, rainwater and process water harvesting, the organic bakery and the wooden frame construction of the park, the planned vertical farming \u2013 all of this goes towards making Seed &amp; Greet a flagship project,\u201d<\/em> says Simon Schandert, co-founder and CTO of Tesvolt. <em>\u201cWe are extremely proud to be part of this project with our storage systems.\u201d<\/em><\/p>\n<h3>Prizewinning storage technology<\/h3>\n<p>The two battery storage system containers from the German manufacturer Tesvolt store electricity from the currently 336 kilowatt-peak (kWp) photovoltaic installation and two small wind turbines in order to shave the expensive peak loads that occur during the charging of electric vehicles. They also, however, store green electricity from the grid when it is particularly cheap and relieve the utility grid when there is more electricity in the grid than is consumed. Gregor Hinz, energy consultant and technical planner for the project, anticipates that the two storage systems will have paid for themselves in just a few years.<\/p>\n<p><em>\u201cTesvolt storage systems can be fully charged and discharged rapidly, which is particularly important from a technical perspective for a charging park. In combination with our hourly purchase of energy on the German spot market, this is the perfect symbiosis for optimal management of self-generated energy,\u201d<\/em> reports Hinz.<\/p>\n<p>Hinz had a shortlist of three commercial storage system manufacturers for the charging park project. Tesvolt made the grade because its TPS flex storage container offers plenty of power in a comparatively small space and it is one of the few containers on the market that meet the operator\u2019s high technical requirements. Developed by Tesvolt\u2019s engineers, its intelligent battery control ensures optimal charging and discharging of cells, along with an impressive expected service life of about 30 years. Tesvolt has already received several awards for its innovative ideas and projects.<\/p>\n<h3>Charging park with vertical farming to be completed in 2022<\/h3>\n<p>The second construction phase is planned for the end of this year, when all the charging stations will be complete and the solar installation will be expanded to a total power of 700 kWp. The five-storey building complex is scheduled for completion by the end of 2022, offering office space for various tenants alongside the Seed &amp; Greet caf\u00e9-bistro. The vertical greenhouse, covering four storeys and 1,000 square metres, will then be located between the two buildings, housing salad, strawberries and blueberries grown for use at the bakery.<\/p>\n<h4>About Tesvolt<\/h4>\n<p>Tesvolt specialises in battery storage systems for trade and industry. The innovative company from Wittenberg produces lithium storage systems with prismatic battery cells from Samsung SDI based on nickel manganese cobalt oxide. Tesvolt storage systems are always a good match, for high or low voltage, on- or off-grid. They can be used with all renewable energy sources or with combined heat and power units or fuel cells.<\/p>\n<p>Tesvolt has won accolades including received the German Entrepreneur Award in the \u201cRising Stars\u201d category. Tesvolt also received \u201cThe smarter E AWARD\u201d in the \u201cOutstanding Projects\u201d category and the international Alliance for Rural Electrification (ARE) award for a project supplying off-grid power supply to an avocado farm in south-west Australia.<\/p>\n<p><a href=\"https:\/\/www.tesvolt.com\/de\/presse\/tesvolt-stromspeicher-senkt-energiekosten-in-fischzucht__prr38.html\" target=\"_blank\" rel=\"noopener noreferrer\">www.tesvolt.com<\/a><\/p>\n<h4>Press contact<\/h4>\n<p>Vera Neuh\u00e4user<br \/>\nTel. +49 30 \u2013 221 83 82 49<br \/>\nMobile +49 178 \u2013 53 68 425<br \/>\n<a href=\"mailto:vera.neuhaeuser@sunbeam-communications.com\" target=\"_blank\" rel=\"noopener noreferrer\">vera.neuhaeuser@sunbeam-communications.com<\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Press Release Europe\u2019s largest charging park for electric cars opens Tesvolt supplies 2 MWh storage system for 100-percent green power [&hellip;]<\/p>\n","protected":false},"author":5,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"rs_blank_template":"","rs_page_bg_color":"","slide_template_v7":"","footnotes":""},"categories":[610,5122,5147],"tags":[620,628,5728],"yst_prominent_words":[4574,4575,4576,634,4582,1402,4583,1450,4584,4129,4585,4145,4146,4150,4151,4155,4516,4571,4572,4573],"class_list":["post-70296","post","type-post","status-publish","format-standard","hentry","category-energy-storage","category-tesvolt-en","category-e-mobility","tag-energy-storage","tag-battery-storage","tag-tesvolt-en-2"],"_links":{"self":[{"href":"https:\/\/sunbeam-communications.com\/en\/wp-json\/wp\/v2\/posts\/70296","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/sunbeam-communications.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/sunbeam-communications.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/sunbeam-communications.com\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/sunbeam-communications.com\/en\/wp-json\/wp\/v2\/comments?post=70296"}],"version-history":[{"count":2,"href":"https:\/\/sunbeam-communications.com\/en\/wp-json\/wp\/v2\/posts\/70296\/revisions"}],"predecessor-version":[{"id":70308,"href":"https:\/\/sunbeam-communications.com\/en\/wp-json\/wp\/v2\/posts\/70296\/revisions\/70308"}],"wp:attachment":[{"href":"https:\/\/sunbeam-communications.com\/en\/wp-json\/wp\/v2\/media?parent=70296"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/sunbeam-communications.com\/en\/wp-json\/wp\/v2\/categories?post=70296"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/sunbeam-communications.com\/en\/wp-json\/wp\/v2\/tags?post=70296"},{"taxonomy":"yst_prominent_words","embeddable":true,"href":"https:\/\/sunbeam-communications.com\/en\/wp-json\/wp\/v2\/yst_prominent_words?post=70296"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}